Project Details

  • Home
  • Projects
  • Biodigester Tanks & MS Toilet Cabins Dispatched to Kuwait
FRP Tanks

Biodigester Tanks & MS Toilet Cabins Dispatched to Kuwait

This case study covers the successful installation of a biodigester tank and modular steel (MS) toilet cabins in Kuwait. The project was a part of a large infrastructure development program in remote desert areas. Our solution provided safe, sustainable, and practical sanitation facilities that worked well under challenging weather conditions. The results included a 90% drop in waste transport costs, zero environmental issues, and higher worker satisfaction across multiple project sites.

  • CLIENT: Kuwait
  • SECTOR: Construction
  • NEED: Durable FRP tanks for chemical storage and MS toilet cabins for sanitation use.
LOCATION Kuwait

The Challenge

Kuwait’s big infrastructure projects faced many sanitation challenges:

  • Construction areas were 50-80 km away from the nearest sewage treatment plant.
  • With sandstorms and high humidity, temperatures reached 50°C (122°F).
  • All waste systems had to follow Kuwait’s strict KEPA standards.
  • Needed clean and safe toilets for various workers across multiple shifts.
  • Moving and maintaining facilities in desert terrain was tough.
  • The client wanted to cut expenses but still keep good service quality.

Our Solution

We built a full sanitation setup that combined biodigester tanks with strong modular toilet cabins.

Biodigester Tank System

  • Tanks holding 5,000 litres of chemicals
  • Can treat up to 15,000 litres of chemicals every day without breakage
  • Solar-powered systems to keep them running in desert heat
  • Automatic monitoring to keep pH and chemicals balanced
  • Made with strong fiberglass and UV protection to last in harsh sun

MS Toilet Cabins

  • Steel toilet cabins with anti-rust treatment
  • Fitted with water-saving taps and proper ventilation
  • Handwashing stations with foot pedals for hygiene
  • Solar-powered lights and exhaust fans
  • Easy to clean and maintain
  • Built to be accessible for all users

Implementation Process

  • Phase 1: Planning & Coordination:
    The project began with meetings between our team and the client to understand the site’s needs. Based on this information, we created customised layouts for smooth waste flow and easy maintenance. During this stage, we also obtained the required approvals from KEPA and municipal authorities.

  • Phase 2: Manufacturing & Quality Check:
    In this phase, our team manufactured the biodigester tanks with added insulation to resist desert heat. We also produced modular steel toilet cabins that underwent strict quality checks to ensure durability and safety.

  • Phase 3: Transportation:
    Once the systems were ready, we arranged heavy-duty vehicles to transport the tanks and cabins to their respective places.

Results & Impact

  • Operational Achievements: The biodigester tanks and MS toilet cabins exceeded KEPA discharge standards with 95% organic matter reduction. Compared to older methods, it cut waste transportation costs by 90% and saved a lot of money.
  • Worker Satisfaction & Health: Workers are much happier and healthier with this system. The toilets and washing areas are clean and easy to use. Their health also improved significantly, with fewer stomach-related illnesses compared to other projects. All toilet cabins are completely accessible for people with disabilities.
  • Environmental Benefits: The system helps the environment by reducing transport-related carbon emissions and solid waste taken away for disposal.

Testimonial

Head of Operations

Sanitation was our biggest challenge with several workers across remote sites. Traditional septic systems would have cost us a fortune in daily pump-outs. The biodigester solution cut our storage costs and boosted workers' satisfaction. Creative Fibrotech didn’t just deliver equipment - they solved our logistics nightmare.

Ready to discuss your large storage needs?